August 2010 – Between the Hollands Diep and the Haringvliet is the 1200 metre long Haringvlietbrug. This bridge has been thoroughly renovated and reinforced. The system of end-bearing piles was replaced and now meets the current standards and can accommodate increased traffic loads. The steel structures were galvanised by Verzinkerij Heerhugowaard and a three-layer wet paint system was applied, followed by a final coat of polyurethane. The entire preserving process was supervised by Verzinkerij Heerhugowaard.